Installation
NOTE: If loop temperatures are expected below the am-
bient dew point, the optional internal insulation package
must be ordered. Insulation must also be installed on
loop water piping on those sections which run through
unheated areas or are located outside the building.
Condensate Piping
Unit is supplied with condensate drain hose, 15.9mm
I.D. flexible plastic nonpressure-rated, protruding from
piping side of unit. Connect this hose to building drain.
Avoid making kinks in hose to ensure an unobstructed
flow of condensate from the unit to the drain. DO NOT
twist, pull hose out, or push excess hose into unit. If
hose will not connect to your building drain several
options include, relocate end of building drain, add to
or cut hose, use hard plastic or copper elbow fittings
for tight radii (put inside hose). Keep hose positioned
within or over subbase area so hose does not interfer
with front cabinet. Cabinet should not push or reroute
hose. Clamp all joints watertight. Check
for leaks.
Internally the drain hose is clamped to drain pan and
pitched correctly. Horizontal runs of condensate hose
should be pitched downward 6mm (1/4 inch) minimum
for every 300MM of hose. Avoid low points and unpitch-
ing because dirt collects in these areas and may cause
blockage. If blocked the condensate level in
drain pan increases, when level gets too high, CCE unit
has sensor switch that will shut unit off, overflow may
still occur.
Building drain connection if parallel with floor the
height can be up to 38mm above subbase for proper
pitch and correct drainage, up to 130mm above is
allowable but drainage will be slower. When 65 to
130mm above the hose inside unit will act as a trap.
Heights more than 130mm above subbase are NOT
allowable (condensate overflow may occur). Check if
your unit has a disconnect box option, this limits build-
ing drain locations. See unit Configuration pages.
Field installation of a trap or vent is not required unless
specified by local codes. CCE units are designed
in a blow-through configuration. The condensate
drain pan is located on the outlet side of the blower
so that the pressure in the drain pan is higher than
atmosphere.
When drain connection is completed check for proper
drainage and leaks. Correct if necessary.
If trap is used, check and clean often. See
Maintenance Instructions.
1/2” FPT or
1/2” MPT
1/2” FPT or
1/2” MPT
Notes:
All dimensions are in mm.
*For installed dimension, add to dimension shown 74mm with 3” subbase and 124mm for 5” subbase.
**Dimension reduced by fitting if selected.
Figure 1 Water Connection details
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 29 30

Comments to this Manuals

No comments